Home > News > Content
The Cooler For Engineering Start Details Can Not Be Ignored
Jun 09, 2017

The start of the Cooler for Engineering is easy to ignore a link, in fact, the correct Cooler for Engineering start is not as simple as opening a switch, but there are some start-up details need attention, Yuanwang heat exchanger for everyone in the following do a simple List.

First of all, we need to pay attention to the start of the Cooler for Engineering before the start of the Cooler for Engineering test qualified mark, because only the test of the Cooler for Engineering can be put into normal use, in addition, before the start of the internal cooling of the Cooler for Engineering, only after drainage Can be started.

Secondly, we need to detect the other parts of the Cooler for Engineering is not already installed, the screws are not already twisted strong, the power is not already connected, these factors have a direct impact on the use of the Cooler for Engineering.

Finally, our Cooler for Engineering in the beginning of the need to pay attention to the changes in the indicators, a direct understanding of whether the normal operation of the Cooler for Engineering.

Some of the details mentioned above apply not only to the start-up link, but also to the use of the equipment after the inspection. Only in the operation of the whole process of full attention to the dynamics of the equipment in order to detect problems, solve the problem, effectively avoid unnecessary losses.